Compare and adjust dates
35 min · Intermediate
Need help? Ask a tutor on WhatsApp (opens in a new tab)Dates are objects, so Java compares them with methods such as isBefore and isAfter, not with < and >. To change a date, you ask for a new one: a few days later with plusDays, a set day with withDayOfMonth, or a rule like "the last day of the month" with a TemporalAdjuster.
Comparing dates: isBefore, isAfter, isEqual
Was the fee paid before the due date? Is the exam after the holiday? < and > work only on numbers, so paid < due does not compile for LocalDate. Use paid.isBefore(due), paid.isAfter(due) and paid.isEqual(due). Each returns a boolean.
Example 1 · Comparing and sorting dates
import java.time.LocalDate;import java.util.ArrayList;import java.util.List;
public class CompareDatesDemo { public static void main(String[] args) { LocalDate due = LocalDate.of(2024, 3, 10); LocalDate paid = LocalDate.of(2024, 3, 12);
System.out.println("paid before due? " + paid.isBefore(due)); System.out.println("paid after due? " + paid.isAfter(due)); System.out.println("paid on due? " + paid.isEqual(due)); System.out.println("compareTo: " + paid.compareTo(due));
// text comparison gets the order wrong System.out.println("\"05-04-2024\" < \"20-03-2024\" as text? " + ("05-04-2024".compareTo("20-03-2024") < 0));
List<LocalDate> exams = new ArrayList<>(); exams.add(LocalDate.of(2024, 4, 5)); exams.add(LocalDate.of(2024, 3, 20)); exams.add(LocalDate.of(2024, 4, 1)); exams.sort(null); System.out.println("Sorted: " + exams); }}paid before due? false paid after due? true paid on due? false compareTo: 2 "05-04-2024" < "20-03-2024" as text? true Sorted: [2024-03-20, 2024-04-01, 2024-04-05]
What this code does
isBefore,isAfterandisEqualread like plain English and return aboolean.compareToreturns a positive number here becausepaidis later thandue.- As text,
05-04-2024sorts before20-03-2024although it is the later date.LocalDateisComparable, so sorting a list of dates gives true calendar order.
Comparing the text instead is a classic bug. As text, "05-04-2024" comes before "20-03-2024" because 0 is smaller than 2, even though 5 April is later. Parse the text into dates first, then compare the dates. LocalDate also implements Comparable, so compareTo works and a List<LocalDate> sorts from earliest to latest with list.sort(null).
LocalDate, isEqual and equals give the same answer. They differ only for zoned values, covered in the time zones lesson.Is a date inside a range?
Admissions are open from 1 April to 30 April, both days included. A date is inside when it is not before the start and not after the end: !d.isBefore(start) && !d.isAfter(end).
Example 2 · Inside a window, both ends included
import java.time.LocalDate;
public class AdmissionWindowDemo { static boolean insideWrong(LocalDate d, LocalDate start, LocalDate end) { return d.isAfter(start) && d.isBefore(end); }
static boolean inside(LocalDate d, LocalDate start, LocalDate end) { return !d.isBefore(start) && !d.isAfter(end); }
public static void main(String[] args) { LocalDate start = LocalDate.of(2024, 4, 1); LocalDate end = LocalDate.of(2024, 4, 30); String[] tests = {"2024-03-31", "2024-04-01", "2024-04-15", "2024-04-30", "2024-05-01"}; for (String t : tests) { LocalDate d = LocalDate.parse(t); System.out.println(d + " wrong=" + insideWrong(d, start, end) + " right=" + inside(d, start, end)); } }}2024-03-31 wrong=false right=false 2024-04-01 wrong=false right=true 2024-04-15 wrong=true right=true 2024-04-30 wrong=false right=true 2024-05-01 wrong=false right=false
What this code does
isAfter(start) && isBefore(end)leaves out both end days, so 1 April and 30 April are wrongly outside.- "Not before the start and not after the end" includes both ends. Testing the day before, both ends and the day after catches this kind of bug.
Writing d.isAfter(start) && d.isBefore(end) looks natural, but it leaves out the first and last day. A student who applies on 30 April would be told "closed". Decide on purpose whether each end is included, and test both ends.
plus, minus and the month-end rule
plusDays, plusWeeks, plusMonths, plusYears and their minus partners return new dates. There is also a general form, plus(3, ChronoUnit.MONTHS).
Example 3 · plusMonths and the month-end rule
import java.time.LocalDate;import java.time.temporal.ChronoUnit;
public class MonthEndDemo { public static void main(String[] args) { LocalDate jan31of2024 = LocalDate.of(2024, 1, 31); LocalDate jan31of2023 = LocalDate.of(2023, 1, 31);
System.out.println("2024-01-31 + 1 month: " + jan31of2024.plusMonths(1)); System.out.println("2023-01-31 + 1 month: " + jan31of2023.plusMonths(1)); System.out.println("2024-02-29 + 1 year: " + LocalDate.of(2024, 2, 29).plusYears(1)); System.out.println("2024-03-31 - 1 month: " + LocalDate.of(2024, 3, 31).minusMonths(1)); System.out.println("+1 month, then +1: " + jan31of2024.plusMonths(1).plusMonths(1)); System.out.println("+2 months at once: " + jan31of2024.plusMonths(2)); System.out.println("plus(10, DAYS): " + jan31of2024.plus(10, ChronoUnit.DAYS)); }}2024-01-31 + 1 month: 2024-02-29 2023-01-31 + 1 month: 2023-02-28 2024-02-29 + 1 year: 2025-02-28 2024-03-31 - 1 month: 2024-02-29 +1 month, then +1: 2024-03-29 +2 months at once: 2024-03-31 plus(10, DAYS): 2024-02-10
What this code does
- When the day does not exist in the new month, Java uses the last valid day: 29 February in 2024, 28 February in 2023. It never spills over into March.
- Once a date has moved to the 29th, it stays on the 29th. That is why two single steps give 29 March but one step of two months gives 31 March.
Example 4 · Trap: an EMI schedule that drifts
import java.time.LocalDate;
public class EmiScheduleDemo { public static void main(String[] args) { LocalDate start = LocalDate.of(2024, 1, 31);
System.out.print("Repeated adding: "); LocalDate d = start; for (int i = 1; i <= 4; i++) { d = d.plusMonths(1); System.out.print(d + " "); } System.out.println();
System.out.print("From the start: "); for (int i = 1; i <= 4; i++) { System.out.print(start.plusMonths(i) + " "); } System.out.println(); }}Repeated adding: 2024-02-29 2024-03-29 2024-04-29 2024-05-29 From the start: 2024-02-29 2024-03-31 2024-04-30 2024-05-31
What this code does
- Adding one month to the previous due date carries the February 29th forward, so every later EMI falls on the 29th instead of the month end.
start.plusMonths(i)measures each due date from the original day, so April correctly falls on the 30th and May on the 31st.
Months have different lengths, so plusMonths follows one rule: if the day does not exist in the new month, it uses the last valid day of that month. 31 January 2024 plus one month is 29 February 2024; in 2023 it is 28 February. 29 February 2024 plus one year is 28 February 2025. This rule has a side effect. Adding one month twice from 31 January gives 29 March, but adding two months at once gives 31 March. For monthly schedules such as EMIs, always add i months to the original start date.
with and TemporalAdjusters
with... methods set one part and keep the rest: withDayOfMonth(1), withMonth(12), withYear(2025). The day must exist, so withDayOfMonth(31) on an April date throws DateTimeException.
Example 5 · with and TemporalAdjusters
import java.time.DayOfWeek;import java.time.LocalDate;import java.time.temporal.TemporalAdjusters;
public class AdjustersDemo { public static void main(String[] args) { LocalDate d = LocalDate.of(2024, 3, 15); // a Friday System.out.println("Date: " + d + " " + d.getDayOfWeek()); System.out.println("withDayOfMonth(1): " + d.withDayOfMonth(1)); System.out.println("withMonth(12): " + d.withMonth(12)); System.out.println("Last day of month: " + d.with(TemporalAdjusters.lastDayOfMonth())); System.out.println("First of next: " + d.with(TemporalAdjusters.firstDayOfNextMonth())); System.out.println("Next Monday: " + d.with(TemporalAdjusters.next(DayOfWeek.MONDAY))); System.out.println("Next Friday: " + d.with(TemporalAdjusters.next(DayOfWeek.FRIDAY))); System.out.println("Friday or same: " + d.with(TemporalAdjusters.nextOrSame(DayOfWeek.FRIDAY))); System.out.println("Second Saturday: " + d.with(TemporalAdjusters.dayOfWeekInMonth(2, DayOfWeek.SATURDAY))); System.out.println("Last Friday: " + d.with(TemporalAdjusters.lastInMonth(DayOfWeek.FRIDAY))); }}Date: 2024-03-15 FRIDAY withDayOfMonth(1): 2024-03-01 withMonth(12): 2024-12-15 Last day of month: 2024-03-31 First of next: 2024-04-01 Next Monday: 2024-03-18 Next Friday: 2024-03-22 Friday or same: 2024-03-15 Second Saturday: 2024-03-09 Last Friday: 2024-03-29
What this code does
with...methods set one part and keep the rest.with(adjuster)moves the date by a rule, and the adjuster works out the month length and weekdays for you.next(FRIDAY)on a Friday jumps a full week ahead, whilenextOrSame(FRIDAY)keeps the same day.dayOfWeekInMonth(2, SATURDAY)finds the second Saturday, a bank holiday in India.
firstDayOfMonth(),lastDayOfMonth(),firstDayOfNextMonth(),firstDayOfYear(),lastDayOfYear()next(DayOfWeek.MONDAY): strictly after the date.nextOrSame(...): the date itself if it is already a Monday.previous(...)andpreviousOrSame(...)work the same way backwards.firstInMonth(...),lastInMonth(...),dayOfWeekInMonth(2, DayOfWeek.SATURDAY)for "second Saturday".
For rules like "last day of this month" or "next Monday", java.time.temporal.TemporalAdjusters has ready-made adjusters. An adjuster is an object that knows how to move a date to a related date. You pass it to with: date.with(TemporalAdjusters.lastDayOfMonth()).
Real-world use: fee due dates and late fees
A college sets the fee due on the 10th of every month. If the 10th is a Sunday, the office is closed, so the due date moves to Monday. Payment after the due date adds a late fee.
Example 6 · Fee due date and late fee check
import java.time.DayOfWeek;import java.time.LocalDate;
public class FeeDueDemo { static LocalDate dueDate(int year, int month) { LocalDate due = LocalDate.of(year, month, 1).withDayOfMonth(10); if (due.getDayOfWeek() == DayOfWeek.SUNDAY) { due = due.plusDays(1); // office closed: move to Monday } return due; }
static int lateFee(LocalDate paid, LocalDate due) { if (!paid.isAfter(due)) { return 0; } return paid.isAfter(due.plusDays(15)) ? 500 : 100; }
public static void main(String[] args) { System.out.println("March due: " + dueDate(2024, 3)); System.out.println("April due: " + dueDate(2024, 4));
LocalDate due = dueDate(2024, 3); String[] payments = {"2024-03-09", "2024-03-11", "2024-03-12", "2024-03-26", "2024-03-27"}; for (String p : payments) { LocalDate paid = LocalDate.parse(p); System.out.println("Paid " + paid + " -> late fee Rs. " + lateFee(paid, due)); } }}March due: 2024-03-11 April due: 2024-04-10 Paid 2024-03-09 -> late fee Rs. 0 Paid 2024-03-11 -> late fee Rs. 0 Paid 2024-03-12 -> late fee Rs. 100 Paid 2024-03-26 -> late fee Rs. 100 Paid 2024-03-27 -> late fee Rs. 500
What this code does
- 10 March 2024 is a Sunday, so the March due date moves to Monday 11 March. 10 April is a Wednesday and stays.
- Paying on the due date is not late, because the check is
isAfter(due). A payment up to 15 days late costs Rs. 100; from day 16 it costs Rs. 500. The test dates sit on both sides of each boundary.
Each rule maps to one method: withDayOfMonth(10) for the 10th, a getDayOfWeek() check plus plusDays(1) for Sunday, and isAfter(due) for "late". Put the rules in small methods, then test them with fixed dates on both sides of every boundary: one day before, the day itself and one day after.
Next step
Check your understanding
12 quick questions